Thomas Industrial Coatings was hired to execute this project for the Great Lakes Dredge & Dock Co.
The scope of work on this project was to perform surface preparation and recoat the hulls on both a dredge and an idler barge. The work was performed while they were dry-docked in Hartford, Illinois. The two-coat system was applied in order to prevent river water and other obstructions from coming into direct contact with the hull’s substrate.
Prepping and coating the Iowa Dredge/Dock and Idler Barge
Client:
Great Lakes Dredge & Dock Co.
Size:
12,000 sq ft
Year completed:
2011
Dollar value:
$50,000
Javascript is required to view this map.
Hartford, IL