Thomas Industrial Coatings was hired to modify and coat two existing jet fuel storage tanks for the US Army Corps of Engineers. The tanks, along with all associated piping and a new pump station, were completed in only a five-month period. As we've mentioned before, we've never been ones to sit around and watch the paint dry.
Coating work at Langley AFB, VA Hydrant Fueling Facility
Client:
Structural Associates
Year completed:
2006
Dollar value:
$350,000
Javascript is required to view this map.
Langley AFB, VA