The I-29/35 corridor leading into downtown Kansas City, Missouri is being reconstructed as a landmark bridge for the area. We've been hired for surface preparation, concrete coating and industrial coating application. With more than 850,000 square feet and a projected 100,000 vehicles per day, the construction of the Christopher S. Bond Bridge is significant in both size and structure. This is a project we're proud to be a part of.
kcICON Project / Paseo Bridge industrial coating job
Client:
Missouri Dept of Transportation / Paseo Corridor Constructors, a joint venture between Clarkson Construction Company and Massman Construction
Size:
855,000 sq ft
Year completed:
2011
Dollar value:
$2,050,000