Two of the clarifiers we painted, each being approximately 300 feet
Two of the clarifiers we painted, each being approximately 300 feet
Submerged steel coated with three coats of epoxy
Submerged steel coated with three coats of epoxy
Non-submerged steel was coated with two coats of epoxy and one coat of urethane
Non-submerged steel was coated with two coats of epoxy and one coat of urethane
Two coats of epoxy were applied to the interior pipe
Two coats of epoxy were applied to the interior pipe
One of the pipe galleries in the basement
One of the pipe galleries in the basement

Wastewater treatment plants can require an array of different coating systems and a variety of different coatings processes. The Coldwater Wastewater Treatment Plant was no exception. From concrete linings to painting pipes, Thomas Industrial Coatings worked with the general contractor to finish the project for the owner on time and per the specifications.

And it's yet another job we're proud to have the Thomas name on.

 

 

Let's Talk
Interested in hiring us for services?

Prepping and coating Coldwater Wastewater Treatment Plant

Client: 
Metropolitan St. Louis Sewer District
Size: 
185,000 sq ft
Year completed: 
2009
Dollar value: 
$1,094,823